Project 3C widened I-35 from 4 lanes to 6 lanes for approximately 3.4 miles from North Loop 363 to South Loop 340 in Hewitt/Robinson.

Need & Purpose
  • Need:  Increased truck traffic along the I-35 corridor coupled with regional population growth in Texas created travel demand that exceeded its capacity. The existing I-35 facility through Central Texas is an essential element of the local and regional transportation system.
  • Purpose: The purpose of the project is to meet local and regional travel demands by increasing capacity; upgrading the transportation infrastructure to meet current FHWA and TxDOT design standards for interstates, bridges, and frontage roads; thereby improving the safety of travelers along I-35.
End Result
This project  addressed congestion while improving safety at this I-35 location by:
  • Widening approximately 3.4 miles of
    I-35 from four lanes to six lanes (three lanes in each direction).
  • Upgrading on and off ramps.
  • Converting frontage roads to one-way
  • New direct crossover, u-turns and electronic message signs
Funding
  • Construction Cost Estimate: $88.4 million
Schedule
  • Project 3C Construction is Complete